Project name
Engineering Design of “A” Category Office Building in Rokolya Street
Project Objective
Design of the building services systems for the “A” category office building on Rokolya Street, using the latest technologies and methods to make the final building comfortable, energy efficient and environmentally friendly.
Project Details
Building Size
The office building has a floor area of 1200 m².
Heating-Cooling
A heat pump system that provides both heating and cooling.
Underfloor heating
For a pleasant indoor climate, underfloor heating will be installed.
Fan Coil Cooling
Fan-coil units ensure even and efficient cooling.
Artificial Ventilation
Fresh air is supplied through an artificial ventilation system.
Design Methods
The office building is designed using the latest technological solutions and innovations:
Application of BIM (Building Information Modelling)
The project is designed according to the BIM methodology with LOD350 detailing. This level of detail allows accurate and detailed modelling of building services systems, which helps to minimise construction errors and optimise operational processes.
Project Status
Construction Plans
The construction plans have been completed and submitted.
Start of implementation
Construction is expected to start in the autumn.
Expected Results and Benefits
Energy efficiency
The combination of a heat pump system and underfloor heating results in significant energy savings, reducing the running costs of the building.
Comfort and convenience
Fan-coil cooling and artificial ventilation provide an optimal indoor climate for office workers, increasing work efficiency and comfort.
Sustainability
Building services engineering systems use environmentally friendly solutions that contribute to sustainable development and reduce the burden on the environment.
Target group
The primary target group of the project is businesses, for whom a modern, comfortable and energy-efficient working environment is important. The project guarantees a high quality office infrastructure, which makes the location attractive to tenants looking for premium office space.
Deadlines and Milestones
Submission of Export Plans
It was done successfully.
Start execution
Planned date: Autumn
Other information
The use of BIM not only improves the efficiency of the design process, but also provides a number of benefits during subsequent operation, such as accurate maintenance information and easier system upgrades.